8/15/2016

  • Surveyed cab and developed initial insulation / covering plan
  • Removed grate over center console / air vents
  • Removed CTIS control box
  • Unboxed and cleaned metal for roof rack
Removed Grate and CTIS Control Box
Removed Grate and CTIS Control Box
CTIS Control Box
CTIS Control Box
Unboxed and Cleaned Metal for Roof Rack
Unboxed and Cleaned Metal for Roof Rack
Metal for Roof Rack
Metal for Roof Rack
Advertisements

One thought on “8/15/2016

  1. Progress is fast, and I do like your plan for the extendable awning. We have had several caravans, and although pulling the roof awning through the channel was so hard, ( I am SHORT) even the roof was a huge bonus, in rain or heat,

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s